{"id":15625,"date":"2026-01-06T16:37:41","date_gmt":"2026-01-06T08:37:41","guid":{"rendered":"http:\/\/www.erun-tech.com\/?post_type=dt_portfolio&#038;p=15625"},"modified":"2026-01-06T16:37:41","modified_gmt":"2026-01-06T08:37:41","slug":"chuanbogaoyafadianjijianxiuliuchengzhinanjiedefangdianjueyuanjianceyuanquanfanghu-sop","status":"publish","type":"dt_portfolio","link":"http:\/\/www.erun-tech.com\/en\/project\/chuanbogaoyafadianjijianxiuliuchengzhinanjiedefangdianjueyuanjianceyuanquanfanghu-sop","title":{"rendered":"Ship's High Voltage Generator Overhaul Procedure Guide: Ground Discharge, Insulation Monitoring and Safety Protection SOP"},"content":{"rendered":"<div style=\"font-family: 'Segoe UI', Arial, sans-serif; line-height: 1.8; color: #333; max-width: 1100px; margin: 0 auto; background: #fff; padding: 20px;\">\n<div style=\"text-align: center; border-bottom: 5px solid #ef9308; padding-bottom: 30px; margin-bottom: 40px;\">\n<h1 style=\"color: #1f365c; font-size: 30px; margin-bottom: 10px; font-weight: bold;\">Operational Procedures for High-Voltage Power Distribution Prior to High-Voltage Generator Maintenance<\/h1>\n<div style=\"display: inline-block; background: #c0392b; color: #fff; padding: 6px 20px; border-radius: 4px; font-size: 14px; letter-spacing: 1px; font-weight: bold;\">Core High-Voltage Safety Procedures for Ships (HV Safety Procedures)<\/div>\n<\/div>\n<section style=\"margin-bottom: 50px;\">\n<h2 style=\"background: #1f365c; color: #fff; padding: 12px 25px; border-left: 10px solid #ef9308; border-radius: 4px; font-size: 20px;\">I. Precautions for the Operation and Maintenance of High-Voltage Electrical Systems on Ships<\/h2>\n<div style=\"margin-top: 25px; padding: 0 15px;\">\n<div style=\"background: #fdf2f2; border: 1px solid #f9d6d6; padding: 20px; border-radius: 8px; margin-bottom: 25px;\">\n<p style=\"margin: 0; color: #c0392b; font-weight: bold;\">\u26a0\ufe0f Safety Warning:<\/p>\n<p style=\"margin: 10px 0 0 0;\">In high-voltage electrical systems on ships, even if operators do not come into direct contact with live equipment, they may still suffer a serious electric shock if they inadvertently come too close to live equipment\u2014within the specified safe operating distance. When it is necessary to operate certain equipment while it is energized, strict adherence to safety operating procedures is required,<strong>Wear insulated gloves and shoes, and use specialized insulated tools<\/strong>Proceed.<\/p>\n<\/div>\n<div style=\"display: grid; grid-template-columns: repeat(auto-fit, minmax(240px, 1fr)); gap: 20px;\">\n<div style=\"border: 1px solid #ddd; padding: 15px; border-radius: 6px; border-top: 4px solid #1f365c;\"><strong style=\"color: #1f365c;\">(1) Preparations Before Maintenance<\/strong><br \/>\nWith the chief engineer\u2019s approval, notify the engineer on duty and designate a safety supervisor; keep a record of the tools you are carrying.<\/div>\n<div style=\"border: 1px solid #ddd; padding: 15px; border-radius: 6px; border-top: 4px solid #1f365c;\"><strong style=\"color: #1f365c;\">(2) Physical Condition Prior to Maintenance<\/strong><br \/>\nThe diesel engine's start air valve should be closed; the generator's start mode should be switched from automatic to manual; ensure there is no water, gas, or oil in the vicinity.<\/div>\n<div style=\"border: 1px solid #ddd; padding: 15px; border-radius: 6px; border-top: 4px solid #1f365c;\"><strong style=\"color: #1f365c;\">(3) Requirements for Maintenance Work<\/strong><br \/>\nDisconnect the main switch, open and close the grounding switch, and post a warning sign; empty any loose items from your pockets and wear clean gloves to prevent sweat from dripping in.<\/div>\n<div style=\"border: 1px solid #ddd; padding: 15px; border-radius: 6px; border-top: 4px solid #1f365c;\"><strong style=\"color: #1f365c;\">(4) Resume operations after maintenance is complete<\/strong><br \/>\nTake inventory of the tools, verify the records, and secure the cover plate; confirm that no one is performing maintenance; check the bearing lubricant level.<\/div>\n<\/div>\n<\/div>\n<\/section>\n<section style=\"margin-bottom: 50px;\">\n<h2 style=\"background: #1f365c; color: #fff; padding: 12px 25px; border-left: 10px solid #ef9308; border-radius: 4px; font-size: 20px;\">II. Maintenance Procedures for Marine High-Voltage Generators<\/h2>\n<div style=\"margin-top: 25px; padding: 0 15px;\">\n<h3 style=\"color: #1f365c; border-bottom: 2px solid #eee; padding-bottom: 8px;\">(I) Maintenance Procedures for High-Voltage Generators on Ships<\/h3>\n<p><strong>(1) The Standby Machine Principle:<\/strong>High-voltage ship generators are inspected only when they are in standby mode to ensure the continuity of power supply to the ship's power plant.<\/p>\n<div style=\"background: #f0f4f8; padding: 25px; border-radius: 12px; margin: 20px 0;\">\n<p><strong>(2) Preparation Steps:<\/strong>The generator set mode selector switch must be set to the \u201cManual\u201d position, the control mode must be switched to local control, and the local control panel<strong>\u201cTurn the \u201dBlock Handle\u201c to the \u201dSTOP\u201d position<\/strong>, to prevent accidental startup.<\/p>\n<div style=\"text-align: center; margin-top: 15px;\">\n<div id=\"attachment_15626\" style=\"width: 451px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-15626\" class=\"wp-image-15626\" title=\"6f07cc5b4b84e1521e14422a0a2e3dfe\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/6f07cc5b4b84e1521e14422a0a2e3dfe.png\" alt=\"Figure 11-10: Preparations Before High-Voltage Generator Maintenance\" width=\"441\" height=\"496\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/6f07cc5b4b84e1521e14422a0a2e3dfe.png 824w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/6f07cc5b4b84e1521e14422a0a2e3dfe-267x300.png 267w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/6f07cc5b4b84e1521e14422a0a2e3dfe-768x863.png 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/6f07cc5b4b84e1521e14422a0a2e3dfe-11x12.png 11w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/6f07cc5b4b84e1521e14422a0a2e3dfe-600x674.png 600w\" sizes=\"auto, (max-width: 441px) 100vw, 441px\" \/><p id=\"caption-attachment-15626\" class=\"wp-caption-text\">Figure 11-10: Preparations Before High-Voltage Generator Maintenance<\/p><\/div>\n<\/div>\n<\/div>\n<p><strong>(3) Voltage testing procedure:<\/strong>Turn off the main switch, shut down the excitation power supply, and through<strong>High Voltage Indicator<\/strong>Check for voltage. If there is no voltage, switch the circuit breaker to<strong>test location<\/strong>\u3002<\/p>\n<div style=\"border: 2px solid #c0392b; padding: 25px; border-radius: 12px; margin: 20px 0;\">\n<p><strong>(4) Grounding and Protection:<\/strong>Close the grounding switch and fully discharge the system. Assign a supervisor and post warning signs. Obtain approval from the chief engineer and notify the engineer on duty. Maintenance may only begin after everything has been verified.<\/p>\n<div style=\"text-align: center; margin-top: 15px;\">\n<div id=\"attachment_15628\" style=\"width: 358px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-15628\" class=\"wp-image-15628\" title=\"b1ed9931a959bb92d41be4d44c8c79da-1\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/b1ed9931a959bb92d41be4d44c8c79da-1.png\" alt=\"Figure 11-11 Schematic Diagram of Earthing Switch Operation\" width=\"348\" height=\"164\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/b1ed9931a959bb92d41be4d44c8c79da-1.png 530w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/b1ed9931a959bb92d41be4d44c8c79da-1-300x142.png 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/b1ed9931a959bb92d41be4d44c8c79da-1-18x8.png 18w\" sizes=\"auto, (max-width: 348px) 100vw, 348px\" \/><p id=\"caption-attachment-15628\" class=\"wp-caption-text\">Figure 11-11 Schematic Diagram of Earthing Switch Operation<\/p><\/div>\n<\/div>\n<\/div>\n<p><strong>(5) Personal Protective Equipment:<\/strong>When measuring winding insulation or disconnecting grounding resistance for maintenance, operators must wear insulated gloves and insulated shoes.<\/p>\n<h3 style=\"color: #1f365c; border-bottom: 2px solid #eee; padding-bottom: 8px; margin-top: 40px;\">(2) Precautions for High-Voltage Generator Maintenance<\/h3>\n<div style=\"display: grid; grid-template-columns: 1fr 1fr; gap: 20px; margin-top: 20px;\">\n<div style=\"background: #fff; border: 1px solid #ddd; padding: 20px; border-radius: 8px;\">\n<h4 style=\"color: #ef9308; margin-top: 0;\">1. Strict Grounding and Discharge<\/h4>\n<p style=\"font-size: 14px;\">The residual electric field in the stator or field windings carries a high charge density, posing a significant hazard. Before shutting down for maintenance, a grounding and discharging procedure must be performed to ensure that the grounding is reliable and that the windings are fully discharged.<\/p>\n<\/div>\n<div style=\"background: #fff; border: 1px solid #ddd; padding: 20px; border-radius: 8px;\">\n<h4 style=\"color: #ef9308; margin-top: 0;\">2. Monitor Generator Insulation<\/h4>\n<p style=\"font-size: 14px;\"><strong>Stator:<\/strong>For a 6,600-volt system, use a GQ meter rated at 2,500 volts or higher for measurement. The neutral point grounding resistor must be disconnected.<br \/>\n<strong>Rotor:<\/strong>When measuring with a 500-volt megohmmeter, the automatic voltage regulator (AVR) must be disconnected.<\/p>\n<\/div>\n<div style=\"background: #fff; border: 1px solid #ddd; padding: 20px; border-radius: 8px;\">\n<h4 style=\"color: #ef9308; margin-top: 0;\">3. Leak Detection System<\/h4>\n<p style=\"font-size: 14px;\">High-voltage generators typically use<strong>Water-Cooled Air Cooler<\/strong>. The cooler is located at the top, and water leaks can easily damage the windings. During maintenance, the effectiveness of the water leak alarm system must be tested periodically and recorded.<\/p>\n<\/div>\n<div style=\"background: #fff; border: 1px solid #ddd; padding: 20px; border-radius: 8px;\">\n<h4 style=\"color: #ef9308; margin-top: 0;\">4. Recovery Procedure<\/h4>\n<p style=\"font-size: 14px;\">Once maintenance is complete, strictly follow the restoration procedure. Restore the status of all switches and equipment in the correct order to prepare for operation.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<footer style=\"text-align: center; margin-top: 80px; padding-top: 30px; border-top: 1px solid #eee; color: #999; font-size: 13px;\">Technical Training Manual for Marine Electronics and Electrical Technicians (ETO) | Practical Maintenance of High-Voltage Generators | 2026 Revised Edition<\/footer>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Operation Procedures of High Voltage Power Distribution Before Overhauling High Voltage Generator HV Safety Procedures I. ...<\/p>","protected":false},"author":1,"featured_media":15629,"comment_status":"open","ping_status":"closed","template":"","dt_portfolio_category":[891],"dt_portfolio_tags":[],"class_list":["post-15625","dt_portfolio","type-dt_portfolio","status-publish","has-post-thumbnail","hentry","dt_portfolio_category-dianzidianqiyuanshicaopinggukecheng","dt_portfolio_category-891","description-off"],"_links":{"self":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/15625","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio"}],"about":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/types\/dt_portfolio"}],"author":[{"embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/comments?post=15625"}],"version-history":[{"count":1,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/15625\/revisions"}],"predecessor-version":[{"id":15630,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/15625\/revisions\/15630"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/media\/15629"}],"wp:attachment":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/media?parent=15625"}],"wp:term":[{"taxonomy":"dt_portfolio_category","embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio_category?post=15625"},{"taxonomy":"dt_portfolio_tags","embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio_tags?post=15625"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}