{"id":15631,"date":"2026-01-06T16:46:18","date_gmt":"2026-01-06T08:46:18","guid":{"rendered":"http:\/\/www.erun-tech.com\/?post_type=dt_portfolio&#038;p=15631"},"modified":"2026-01-06T16:46:18","modified_gmt":"2026-01-06T08:46:18","slug":"chuanbo-6600v-gaoyaxitongjianxiushiwufadianjiweihuduanluqiyaochuyujiedekaiguancaozuo-sop","status":"publish","type":"dt_portfolio","link":"http:\/\/www.erun-tech.com\/en\/project\/chuanbo-6600v-gaoyaxitongjianxiushiwufadianjiweihuduanluqiyaochuyujiedekaiguancaozuo-sop","title":{"rendered":"Practical Maintenance of 6600V High-Voltage Systems on Vessels: Generator Maintenance, Circuit Breaker Withdrawal, and Grounding Switch Operation SOP"},"content":{"rendered":"<div style=\"font-family: 'Segoe UI', Arial, sans-serif; line-height: 1.8; color: #333; max-width: 1100px; margin: 0 auto; background: #fff; padding: 20px;\">\n<div style=\"text-align: center; border-bottom: 5px solid #1f365c; padding-bottom: 30px; margin-bottom: 40px;\">\n<h1 style=\"color: #1f365c; font-size: 30px; margin-bottom: 10px; font-weight: bold;\">Overhaul procedures for high-voltage main switches<\/h1>\n<div style=\"display: inline-block; background: #ef9308; color: #fff; padding: 6px 20px; border-radius: 4px; font-size: 14px; font-weight: bold; letter-spacing: 1px;\">\u26a0\ufe0f High Voltage Hazards: Strict Adherence to Operating Procedures and Interlocking Requirements<\/div>\n<\/div>\n<section style=\"margin-bottom: 50px;\">\n<h2 style=\"background: #1f365c; color: #fff; padding: 12px 25px; border-left: 10px solid #ef9308; border-radius: 4px; font-size: 20px;\">I. Ship's high-voltage main switch overhaul operation procedures<\/h2>\n<div style=\"margin-top: 25px; padding: 0 15px;\">\n<h3 style=\"color: #1f365c; border-bottom: 2px solid #eee; padding-bottom: 8px;\">(i) Ship's high-voltage main switch maintenance operation procedures<\/h3>\n<p style=\"text-indent: 2em;\">High-voltage switchboards are usually divided into left and right sides, which are placed in different high-voltage distribution rooms, which are equipped with high-voltage insulated floors, and high-voltage switchboards have a very high level of protection, which are used to ensure the safety of operators.<\/p>\n<div style=\"display: flex; gap: 20px; margin: 20px 0; flex-wrap: wrap;\">\n<div style=\"flex: 1; min-width: 300px; background: #fdf2f2; padding: 20px; border-radius: 8px; border-left: 5px solid #c0392b;\"><strong style=\"color: #c0392b;\">Inspection process:<\/strong><br \/>\nPlace the ship's HV main switch in the disconnected position \u2192 disconnect the corresponding disconnecting switch \u2192 close the earthing switch \u2192 open the switchgear cabinet \u2192 repair the HV circuit breaker.<\/div>\n<div style=\"flex: 1; min-width: 300px; background: #f0f9eb; padding: 20px; border-radius: 8px; border-left: 5px solid #67c23a;\"><strong style=\"color: #67c23a;\">Recovery Process:<\/strong><br \/>\nClose the switchgear \u2192 disconnect the earth switch \u2192 close the corresponding disconnecting switch \u2192 place the ship's HV main switch in the working position.<\/div>\n<\/div>\n<p style=\"background: #fff8e6; padding: 10px 15px; border-radius: 4px; font-size: 14px; color: #856404;\">* :: Electrical or mechanical interlocks are provided between the main switch, the disconnecting switch and the earthing switch and the cabinet door to prevent misoperation. Operators must follow the process step by step.<\/p>\n<div style=\"display: grid; grid-template-columns: repeat(auto-fit, minmax(400px, 1fr)); gap: 25px; margin-top: 30px;\">\n<div style=\"border: 1px solid #ddd; padding: 20px; border-radius: 8px;\">\n<h4 style=\"color: #1f365c; margin-top: 0; border-left: 4px solid #1f365c; padding-left: 10px;\">(ii) Ship's high-voltage disconnecting switch operating procedures<\/h4>\n<p style=\"font-size: 14px;\">Disconnect switches with visible break points.<strong>No arc extinguishing device, can't open and close the gate with load.<\/strong>. It must work with the circuit breaker: the disconnecting switch can be disconnected only after the circuit breaker has been disconnected; the circuit breaker cannot break the disconnecting switch when it is in the closed position. Conversely, the disconnecting switch must be closed before the circuit breaker is allowed to close.<\/p>\n<\/div>\n<div style=\"border: 1px solid #ddd; padding: 20px; border-radius: 8px;\">\n<h4 style=\"color: #1f365c; margin-top: 0; border-left: 4px solid #1f365c; padding-left: 10px;\">(iii) High-voltage grounding switch operating procedures<\/h4>\n<p style=\"font-size: 14px;\">without an arc extinguishing device.<strong>Cannot open or close the gate with load<\/strong>. It should be closed when the power is out for maintenance to ensure that the line is reliably grounded and to prevent accumulation of electric charge affecting personnel or causing three short circuits when the circuit breaker is closed accidentally so that the circuit breaker is tripped immediately. After maintenance, the sequence is: open the grounding switch \u2192 close the disconnecting switch \u2192 close the circuit breaker.<\/p>\n<\/div>\n<\/div>\n<h3 style=\"color: #1f365c; border-bottom: 2px solid #eee; padding-bottom: 8px; margin-top: 40px;\">(iv) High-voltage main switch withdrawal and feeding operations<\/h3>\n<div style=\"background: #fafafa; padding: 25px; border-radius: 12px; border: 1px solid #eee;\">\n<p><strong>(1) Preparation:<\/strong>Complete high voltage circuit breaker tripping, shutdown, and demagnetization operations prior to generator and control panel maintenance.<\/p>\n<p><strong>(2) Disconnection of isolation:<\/strong>Using a circuit breaker to swing out to<strong>test location<\/strong>method of disconnecting the circuit breaker from the bus.<\/p>\n<p><strong>(3) Grounding:<\/strong>Open the grounding operating door, close the grounding switch using the grounding operating handle, and observe the switchboard ground-closing indication.<\/p>\n<p><strong>(4) Swing out to service position:<\/strong>Continue to swing to the service position, open the cabinet door and disconnect the secondary plug. Use the special trolley to lock and then pull the circuit breaker to the trolley (Figure 11-12).<br \/>\n<span style=\"color: #d35400; font-weight: bold;\">* Note: After completing the grounding, a high-voltage checker must be used to confirm that there is no electricity before carrying out maintenance.<\/span><\/p>\n<div id=\"attachment_15632\" style=\"width: 281px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-15632\" class=\"wp-image-15632\" title=\"5e0f96bd2ce0c17c1b14d431ab1585b2\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/5e0f96bd2ce0c17c1b14d431ab1585b2.png\" alt=\"Figure 11-12 Schematic diagram of high voltage circuit breaker pulled to service position\" width=\"271\" height=\"300\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/5e0f96bd2ce0c17c1b14d431ab1585b2.png 456w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/5e0f96bd2ce0c17c1b14d431ab1585b2-271x300.png 271w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/5e0f96bd2ce0c17c1b14d431ab1585b2-11x12.png 11w\" sizes=\"(max-width: 271px) 100vw, 271px\" \/><p id=\"caption-attachment-15632\" class=\"wp-caption-text\">Figure 11-12 Schematic diagram of high voltage circuit breaker pulled to service position<\/p><\/div>\n<p><strong>(5) Push-in operation:<\/strong>Utilize the trolley to push to the test position and close the cabinet door. Utilize the rocker to swing to the<strong>test location<\/strong>(disconnect switch disconnected), depress the grounding operating door; utilize handle<strong>Disconnect the grounding switch.<\/strong>(confirmation indicator), continue shaking until<strong>working position<\/strong>(as in Figure 11-13).<\/p>\n<div id=\"attachment_15633\" style=\"width: 418px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-15633\" class=\"wp-image-15633\" title=\"Figure 11-13 High-voltage circuit breaker push-in operation\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/60ed68dddcc27e216f47e5ad6232c339.png\" alt=\"Figure 11-13 High-voltage circuit breaker push-in operation\" width=\"408\" height=\"171\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/60ed68dddcc27e216f47e5ad6232c339.png 799w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/60ed68dddcc27e216f47e5ad6232c339-300x126.png 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/60ed68dddcc27e216f47e5ad6232c339-768x322.png 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/60ed68dddcc27e216f47e5ad6232c339-18x8.png 18w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2026\/01\/60ed68dddcc27e216f47e5ad6232c339-600x252.png 600w\" sizes=\"(max-width: 408px) 100vw, 408px\" \/><p id=\"caption-attachment-15633\" class=\"wp-caption-text\">Figure 11-13 High-voltage circuit breaker push-in operation<\/p><\/div>\n<p><strong>(6) Inspection:<\/strong>Verify that the switchboard indicators, high voltage switch status and position indications are consistent with the standby condition.<\/p>\n<\/div>\n<\/div>\n<\/section>\n<section style=\"margin-bottom: 40px;\">\n<h2 style=\"background: #1f365c; color: #fff; padding: 12px 25px; border-left: 10px solid #ef9308; border-radius: 4px; font-size: 20px;\">Second, the high voltage switchboard routine maintenance precautions<\/h2>\n<div style=\"background: #fff; border: 2px solid #1f365c; padding: 25px; border-radius: 8px; margin-top: 20px;\">\n<ul style=\"list-style-type: none; padding: 0;\">\n<li style=\"margin-bottom: 15px; display: flex; align-items: flex-start;\"><span style=\"background: #c0392b; color: #fff; padding: 2px 8px; border-radius: 3px; font-weight: bold; margin-right: 15px; font-size: 12px;\">strictly prohibit<\/span><br \/>\n<strong>High-voltage switchboards are strictly prohibited to work with electricity<\/strong>Always make sure that the equipment is not energized before working.<\/li>\n<li style=\"margin-bottom: 15px; display: flex; align-items: flex-start;\"><span style=\"background: #1f365c; color: #fff; padding: 2px 8px; border-radius: 3px; font-weight: bold; margin-right: 15px; font-size: 12px;\">programs<\/span><br \/>\nWork in strict accordance with safety requirements: Place in test position \u2192 disconnect the disconnecting switch \u2192 discharge to earth. Restore the reverse order after repair.<\/li>\n<li style=\"display: flex; align-items: flex-start;\"><span style=\"background: #ef9308; color: #fff; padding: 2px 8px; border-radius: 3px; font-weight: bold; margin-right: 15px; font-size: 12px;\">defend<\/span>\n<p><strong>Must take proper safety precautions and use high-voltage insulated tools and protective equipment<\/strong>The person must be assisted by a person.<strong>The top guard of the switchboard is strictly forbidden to be approached by personnel.<\/strong><\/li>\n<\/ul>\n<\/div>\n<\/section>\n<footer style=\"text-align: center; margin-top: 60px; padding-top: 30px; border-top: 1px solid #eee; color: #999; font-size: 13px;\">Ship's Electrical and Electronics Officer (ETO) Training Kit | High Voltage Main Switch Overhaul Practice | 2026 Revised Edition<\/footer>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Overhaul Procedures for High Voltage Main Switches \u26a0\ufe0f HIGH VOLTAGE HAZARD: Strictly observe the operating procedures and interlocking requirements I. Operating Procedures for Overhauling High Voltage Main Switches on Ships (i) Ship ...<\/p>","protected":false},"author":1,"featured_media":15634,"comment_status":"open","ping_status":"closed","template":"","dt_portfolio_category":[891],"dt_portfolio_tags":[],"class_list":["post-15631","dt_portfolio","type-dt_portfolio","status-publish","has-post-thumbnail","hentry","dt_portfolio_category-dianzidianqiyuanshicaopinggukecheng","dt_portfolio_category-891","description-off"],"_links":{"self":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/15631","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio"}],"about":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/types\/dt_portfolio"}],"author":[{"embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/comments?post=15631"}],"version-history":[{"count":1,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/15631\/revisions"}],"predecessor-version":[{"id":15635,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio\/15631\/revisions\/15635"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/media\/15634"}],"wp:attachment":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/media?parent=15631"}],"wp:term":[{"taxonomy":"dt_portfolio_category","embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio_category?post=15631"},{"taxonomy":"dt_portfolio_tags","embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/dt_portfolio_tags?post=15631"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}