{"id":15227,"date":"2025-04-27T15:00:10","date_gmt":"2025-04-27T07:00:10","guid":{"rendered":"http:\/\/www.erun-tech.com\/?p=15227"},"modified":"2025-04-27T15:00:10","modified_gmt":"2025-04-27T07:00:10","slug":"wuhanyirunkejiyuanmanwanchenganhuijiaotongzhiyejishuxueyuanlunjizhuanyezhengtibanqianxiangmu-2ba","status":"publish","type":"post","link":"http:\/\/www.erun-tech.com\/en\/wuhanyirunkejiyuanmanwanchenganhuijiaotongzhiyejishuxueyuanlunjizhuanyezhengtibanqianxiangmu-2ba","title":{"rendered":"Wuhan Erun Technology Successfully Completes Comprehensive Relocation Project for Anhui Transportation Vocational College's Marine Engineering Program \u2014 Overcoming Challenges in Two Months to Revitalize Aging Equipment\u201d"},"content":{"rendered":"<p class=\"ds-markdown-paragraph\"><strong>Wuhan Yirun Technology Successfully Completes the Entire Relocation Project for the Marine Engineering Program at Anhui Transportation Vocational and Technical College<\/strong><br \/>\n<strong>\u2014\u2014Two Months of Tenacious Efforts to Overcome Challenges, Achieving a \u201dRebirth\u201d for Aging Equipment\u201d<\/strong><\/p>\n<p class=\"ds-markdown-paragraph\"><strong>August 15, 2024, Hefei<\/strong>\u00a0Recently, Wuhan Yirun Technology Co., Ltd. successfully completed the relocation project for the entire marine engineering training base at Anhui Transportation Vocational and Technical College. Facing the technical risk of potential total failure after moving outdated equipment, the company's technical team rose to the challenge. Within 60 days, they efficiently relocated and upgraded two major training labs and over 40 sets of critical equipment. All operational equipment now functions normally, earning high praise from the college.<\/p>\n<h3><strong>Project Challenge: The \u201dTechnical Test\u201d of Relocating Aging Equipment\u201d<\/strong><\/h3>\n<p class=\"ds-markdown-paragraph\">This relocation involves core practical training equipment for the marine engineering program, including:<\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Marine Power Plant Operation Training Lab<\/strong>Complete systems including 6350Z\/6160 diesel engines, generator sets, marine boilers, and oil separators.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Power Equipment Assembly and Disassembly Training Lab<\/strong>6NVD48 diesel engine, Sulzer RD44 cylinder liners, refrigeration compressors, and other precision teaching equipment<\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\">The greatest challenge of the project lies in the fact that most equipment has been in use for over 15 years, presenting issues such as aging wiring and poor system compatibility. The university initially feared the equipment would become completely obsolete after relocation. However, Wuhan Yirun proposed a three-phase solution: \u201dPre-inspection and maintenance - Customized relocation - System reconstruction.\u201d<\/p>\n<ol start=\"1\">\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Comprehensive Pre-Relocation Diagnosis<\/strong>Conduct 72-hour continuous operational testing on each piece of equipment to establish equipment health records.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Customized Relocation Solutions<\/strong>Design specialized shock-absorbing transport racks for precision equipment; seal critical pipelines with flanged blind flanges.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Systemic restructuring<\/strong>Redesign the mounting base and upgrade outdated piping and control systems for 80% and above models.<\/p>\n<\/li>\n<\/ol>\n<p class=\"ds-markdown-paragraph\"><img decoding=\"async\" class=\"alignnone size-large wp-image-15228\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15911745733218_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15911745733218_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15911745733218_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15911745733218_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15911745733218_.pic_-1536x1152.jpg 1536w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15911745733218_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15911745733218_.pic_.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan EPR Technology Successfully Completed the Relocation Project of Anhui Transportation Vocational and Technical College - 2 Months to Overcome Difficulties and Realize the \u201dNew Rebirth\u201d of Old Equipment Illustration\" alt=\"Wuhan EPR Technology Successfully Completed the Relocation Project of Anhui Transportation Vocational and Technical College - 2 Months to Overcome Difficulties and Realize the \u201dNew Rebirth\u201d of Old Equipment Illustration\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15229\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15941745733221_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15941745733221_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15941745733221_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15941745733221_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15941745733221_.pic_-1536x1152.jpg 1536w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15941745733221_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15941745733221_.pic_.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan Yirun Technology successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 1\" alt=\"Wuhan Yirun Technology successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 1\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15230\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15961745733224_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15961745733224_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15961745733224_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15961745733224_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15961745733224_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15961745733224_.pic_.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan Yirun Technology successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipment Illustration 2\" alt=\"Wuhan Yirun Technology successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipment Illustration 2\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15231\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15971745733225_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15971745733225_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15971745733225_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15971745733225_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15971745733225_.pic_-1536x1152.jpg 1536w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15971745733225_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/15971745733225_.pic_.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome the difficulties and realize the old equipment \u201dnew rebirth\u201d Illustration 3\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome the difficulties and realize the old equipment \u201dnew rebirth\u201d Illustration 3\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15232\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16011745733230_.pic_.jpg\"  width=\"800\" height=\"600\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16011745733230_.pic_.jpg 800w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16011745733230_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16011745733230_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16011745733230_.pic_-600x450.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome the difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 4\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome the difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 4\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15233\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16021745733231_.pic_.jpg\"  width=\"800\" height=\"600\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16021745733231_.pic_.jpg 800w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16021745733231_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16021745733231_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16021745733231_.pic_-600x450.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome the difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 5\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome the difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 5\" \/><br \/>\n<em>Pre-relocation training lab: Equipment layout was cramped, and piping and wiring were disorganized.<\/em><\/p>\n<p class=\"ds-markdown-paragraph\"><img decoding=\"async\" class=\"alignnone size-large wp-image-15234\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16121745733872_.pic_-1024x1024.jpg\"  width=\"1024\" height=\"1024\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16121745733872_.pic_-1024x1024.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16121745733872_.pic_-300x300.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16121745733872_.pic_-150x150.jpg 150w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16121745733872_.pic_-768x768.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16121745733872_.pic_-600x600.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16121745733872_.pic_-200x200.jpg 200w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16121745733872_.pic_.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome the difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 6\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome the difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 6\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15235\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16131745733873_.pic_-1024x1024.jpg\"  width=\"1024\" height=\"1024\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16131745733873_.pic_-1024x1024.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16131745733873_.pic_-300x300.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16131745733873_.pic_-150x150.jpg 150w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16131745733873_.pic_-768x768.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16131745733873_.pic_-600x600.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16131745733873_.pic_-200x200.jpg 200w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16131745733873_.pic_.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 7\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 7\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15236\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16141745733874_.pic_-1024x1024.jpg\"  width=\"1024\" height=\"1024\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16141745733874_.pic_-1024x1024.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16141745733874_.pic_-300x300.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16141745733874_.pic_-150x150.jpg 150w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16141745733874_.pic_-768x768.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16141745733874_.pic_-600x600.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16141745733874_.pic_-200x200.jpg 200w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16141745733874_.pic_.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome the difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 8\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome the difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 8\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15237\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16151745733875_.pic_-1024x1024.jpg\"  width=\"1024\" height=\"1024\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16151745733875_.pic_-1024x1024.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16151745733875_.pic_-300x300.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16151745733875_.pic_-150x150.jpg 150w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16151745733875_.pic_-768x768.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16151745733875_.pic_-600x600.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16151745733875_.pic_-200x200.jpg 200w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16151745733875_.pic_.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 9\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 9\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15238\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16161745733875_.pic_-1024x1024.jpg\"  width=\"1024\" height=\"1024\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16161745733875_.pic_-1024x1024.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16161745733875_.pic_-300x300.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16161745733875_.pic_-150x150.jpg 150w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16161745733875_.pic_-768x768.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16161745733875_.pic_-600x600.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16161745733875_.pic_-200x200.jpg 200w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16161745733875_.pic_.jpg 1280w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipment Illustration 10\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipment Illustration 10\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15239\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16171745733877_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16171745733877_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16171745733877_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16171745733877_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16171745733877_.pic_-1536x1152.jpg 1536w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16171745733877_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16171745733877_.pic_.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 11\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 11\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15240\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-1536x1152.jpg 1536w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 12\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 12\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15241\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16191745733879_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16191745733879_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16191745733879_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16191745733879_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16191745733879_.pic_-1536x1152.jpg 1536w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16191745733879_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16191745733879_.pic_.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 13\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 13\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15242\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16221745733882_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16221745733882_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16221745733882_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16221745733882_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16221745733882_.pic_-1536x1152.jpg 1536w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16221745733882_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16221745733882_.pic_.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 14\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 14\" \/><br \/>\n<em>New Training Lab After Relocation: Functional Zones Clearly Defined, System Identifiers Clearly Labeled<\/em><\/p>\n<h3><strong>Technological Breakthrough: Breathing New Life into Old Equipment<\/strong><\/h3>\n<p class=\"ds-markdown-paragraph\">The project team creatively employed three key technical approaches to ensure success:<\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>3D Scanning and Reconstruction Technology<\/strong>Perform laser scanning on critical equipment such as the 6NVD48 diesel engine to precisely prefabricate the mounting base.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Intelligent Hydraulic Calibration System<\/strong>Solving the Industry Challenge of Excessive Crankshaft Alignment Deviation in the 6160 Diesel Engine<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\"><strong>Modular piping design<\/strong>Quick-release flange joints are adopted, enhancing subsequent disassembly and reassembly efficiency by 300%.<\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\">\u201cThe most surprising result was the 6350Z diesel engine,\u201d stated the university's project lead. \u201dAfter being overhauled by the Yirun team, this three-year-old decommissioned unit now outperforms its pre-relocation specifications across all parameters.\u201d<\/p>\n<h3><strong>A New Benchmark for Industry-Education Integration<\/strong><\/h3>\n<p class=\"ds-markdown-paragraph\">The new training base officially commenced operations in September 2024, featuring the following key characteristics:<\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\">Establish a \u201dDevice Health Monitoring Cloud Platform\u201d to display all operational parameters in real time.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">An AR fault simulation system has been added, capable of generating 30 typical fault scenarios.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">Redesign the piping color identification system in accordance with modern ship engine room standards.<\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><img decoding=\"async\" class=\"alignnone size-large wp-image-15243\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16251745733885_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16251745733885_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16251745733885_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16251745733885_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16251745733885_.pic_-1536x1152.jpg 1536w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16251745733885_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16251745733885_.pic_.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 15\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College&#039;s turbine program - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 15\" \/><img decoding=\"async\" class=\"alignnone size-large wp-image-15240\" src=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-1024x768.jpg\"  width=\"1024\" height=\"768\" srcset=\"http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-1024x768.jpg 1024w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-300x225.jpg 300w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-768x576.jpg 768w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-1536x1152.jpg 1536w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_-600x450.jpg 600w, http:\/\/www.erun-tech.com\/wp-content\/uploads\/2025\/04\/16181745733878_.pic_.jpg 1706w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" title=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 12\" alt=\"Wuhan E-Run successfully completed the overall relocation project of Anhui Transportation Vocational and Technical College - 2 months to overcome difficulties and realize the \u201dnew rebirth\u201d of the old equipmentIllustration 12\" \/><br \/>\n<em>The technical team successfully started the 6350Z diesel engine, with university representatives witnessing the event on-site.<\/em><\/p>\n<p class=\"ds-markdown-paragraph\">The project manager of Wuhan Yirun stated: \u201dThis project has established a replicable technical model for relocating outdated teaching equipment. Moving forward, we will continue to deepen our collaboration with educational institutions to advance the upgrading of maritime vocational education equipment.\u201d<\/p>\n<p class=\"ds-markdown-paragraph\"><strong>Project Timeline<\/strong><\/p>\n<ul>\n<li>\n<p class=\"ds-markdown-paragraph\">June 10, 2024 Pre-maintenance inspection of equipment completed<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">July 15, 2024: Main equipment relocated and installed<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">August 5, 2024: Final generator unit successfully connected to the grid.<\/p>\n<\/li>\n<li>\n<p class=\"ds-markdown-paragraph\">August 10, 2024 All systems passed final acceptance inspection.<\/p>\n<\/li>\n<\/ul>\n<p class=\"ds-markdown-paragraph\"><strong>About Wuhan Yirun<\/strong><br \/>\nSpecializing in technical services for marine and offshore engineering equipment, we have completed the construction of over 30 training laboratories for universities and colleges, and hold CCS certification for ship propulsion system retrofitting.<\/p>\n<p class=\"ds-markdown-paragraph\"><strong>Press Contact<\/strong><br \/>\nMarketing Department Manager Yao<br \/>\nPhone: 18908622857<br \/>\n\u90ae\u7bb1\uff1a68143280@qq.com<\/p>\n<p class=\"ds-markdown-paragraph\">(Note: Equipment specifications in this document have been verified by the university. Image copyright belongs to Wuhan Yirun Technology.)<\/p>","protected":false},"excerpt":{"rendered":"<p>Wuhan Erun Technology Successfully Completes Comprehensive Relocation Project for Anhui Transportation Vocational College's Marine Engineering Program \u2014 Overcoming Challenges in Two Months to Revitalize Aging Equipment...<\/p>","protected":false},"author":1,"featured_media":15240,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[51,73],"tags":[],"class_list":["post-15227","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-gongsixinwen","category-yuanxiaodongtai","category-51","category-73","description-off"],"amp_enabled":true,"_links":{"self":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/posts\/15227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/comments?post=15227"}],"version-history":[{"count":0,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/posts\/15227\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/media\/15240"}],"wp:attachment":[{"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/media?parent=15227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/categories?post=15227"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.erun-tech.com\/en\/wp-json\/wp\/v2\/tags?post=15227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}